You are viewing invoice INV-2026-0417 in your browser.Pay online

Cedar Point Land Surveying

A fictional company. Sample for pdfconversionapi.com, CC0 1.0.

418 Mill Street, Bend, OR 97701 · (541) 555-0148

INVOICE

InvoiceINV-2026-0417
IssuedOctober 31, 2026
DueNovember 30, 2026
ProjectRidgeview Lots 14–15
Bill to
Tumalo Creek Homes LLC
Attn: Accounts Payable
2290 NE Division Street, Suite 4
Bend, OR 97703
Remit to
Cedar Point Land Surveying
418 Mill Street
Bend, OR 97701
Quote INV-2026-0417 with your payment
DateDescriptionQtyRateAmount
2026-10-01Field survey, Lot 14 (two-person crew, 6 h)12$95.00$1,140.00
2026-10-01GPS base station rental, per day1$140.00$140.00
2026-10-02Boundary stakes and caps24$3.75$90.00
2026-10-02Field survey, Lot 14 boundary close (3 h)6$95.00$570.00
2026-10-03Drafting: existing conditions plan5$82.00$410.00
2026-10-06Field survey, Lot 15 (two-person crew, 4 h)8$95.00$760.00
2026-10-06GPS base station rental, per day1$140.00$140.00
2026-10-07County records research3$70.00$210.00
2026-10-07Title commitment review2$110.00$220.00
2026-10-08Drafting: topographic plan, 1 in = 20 ft7$82.00$574.00
2026-10-09Elevation certificate, Lot 141$325.00$325.00
2026-10-09Elevation certificate, Lot 151$325.00$325.00
2026-10-10Wetland flag location (2 h)4$95.00$380.00
2026-10-13Construction staking, building corners6$95.00$570.00
2026-10-13Hub and tack set, per point18$4.50$81.00
2026-10-14Drone flight and orthophoto processing1$610.00$610.00
2026-10-14Ground control targets, per target8$12.00$96.00
2026-10-15Drafting: revisions requested 10/142$82.00$164.00
2026-10-16Field survey, utility locate check (4 h)8$95.00$760.00
2026-10-16Driveway grade stakes10$4.50$45.00
2026-10-17Easement exhibit and legal description1$280.00$280.00
2026-10-20Mileage, site visits (212 mi)212$0.70$148.40
2026-10-20Septic setback verification (2 h)4$95.00$380.00
2026-10-21Plat review meeting with county2$120.00$240.00
2026-10-21Drafting: plat corrections from review3$82.00$246.00
2026-10-22Final plat preparation6$82.00$492.00
2026-10-22Surveyor's certificate and stamp1$150.00$150.00
2026-10-23Mylar prints for recording4$18.50$74.00
2026-10-24Recording fee, passed through at cost1$86.00$86.00
2026-10-27As-built survey, foundation (3 h)6$95.00$570.00
2026-10-27Foundation elevation shots12$6.00$72.00
2026-10-28Drafting: as-built exhibit3$82.00$246.00
2026-10-28Digital deliverables (DWG and PDF set)1$75.00$75.00
2026-10-29Project management4$110.00$440.00
2026-10-30Courier, plat delivery to county1$42.00$42.00
2026-10-30Monument reset after excavation, Lot 152$95.00$190.00
Subtotal$11,341.40
Sales tax$0.00
Total due$11,341.40
Questions about this invoice? Write to billing@cedarpoint.example and quote the invoice number.

Terms

  1. Payment is due 30 days from the issue date. Balances unpaid after 30 days accrue 1% per month.
  2. Field time is billed per person-hour in half-hour steps, including travel within 25 miles of Bend.
  3. Recording and filing fees are passed through at cost and are not refundable.
  4. Survey monuments disturbed by construction are reset at the field rate above.
  5. Plans and plats remain the work product of Cedar Point Land Surveying until paid in full.