A fictional company. Sample for pdfconversionapi.com, CC0 1.0.
418 Mill Street, Bend, OR 97701 · (541) 555-0148
| Date | Description | Qty | Rate | Amount |
|---|---|---|---|---|
| 2026-10-01 | Field survey, Lot 14 (two-person crew, 6 h) | 12 | $95.00 | $1,140.00 |
| 2026-10-01 | GPS base station rental, per day | 1 | $140.00 | $140.00 |
| 2026-10-02 | Boundary stakes and caps | 24 | $3.75 | $90.00 |
| 2026-10-02 | Field survey, Lot 14 boundary close (3 h) | 6 | $95.00 | $570.00 |
| 2026-10-03 | Drafting: existing conditions plan | 5 | $82.00 | $410.00 |
| 2026-10-06 | Field survey, Lot 15 (two-person crew, 4 h) | 8 | $95.00 | $760.00 |
| 2026-10-06 | GPS base station rental, per day | 1 | $140.00 | $140.00 |
| 2026-10-07 | County records research | 3 | $70.00 | $210.00 |
| 2026-10-07 | Title commitment review | 2 | $110.00 | $220.00 |
| 2026-10-08 | Drafting: topographic plan, 1 in = 20 ft | 7 | $82.00 | $574.00 |
| 2026-10-09 | Elevation certificate, Lot 14 | 1 | $325.00 | $325.00 |
| 2026-10-09 | Elevation certificate, Lot 15 | 1 | $325.00 | $325.00 |
| 2026-10-10 | Wetland flag location (2 h) | 4 | $95.00 | $380.00 |
| 2026-10-13 | Construction staking, building corners | 6 | $95.00 | $570.00 |
| 2026-10-13 | Hub and tack set, per point | 18 | $4.50 | $81.00 |
| 2026-10-14 | Drone flight and orthophoto processing | 1 | $610.00 | $610.00 |
| 2026-10-14 | Ground control targets, per target | 8 | $12.00 | $96.00 |
| 2026-10-15 | Drafting: revisions requested 10/14 | 2 | $82.00 | $164.00 |
| 2026-10-16 | Field survey, utility locate check (4 h) | 8 | $95.00 | $760.00 |
| 2026-10-16 | Driveway grade stakes | 10 | $4.50 | $45.00 |
| 2026-10-17 | Easement exhibit and legal description | 1 | $280.00 | $280.00 |
| 2026-10-20 | Mileage, site visits (212 mi) | 212 | $0.70 | $148.40 |
| 2026-10-20 | Septic setback verification (2 h) | 4 | $95.00 | $380.00 |
| 2026-10-21 | Plat review meeting with county | 2 | $120.00 | $240.00 |
| 2026-10-21 | Drafting: plat corrections from review | 3 | $82.00 | $246.00 |
| 2026-10-22 | Final plat preparation | 6 | $82.00 | $492.00 |
| 2026-10-22 | Surveyor's certificate and stamp | 1 | $150.00 | $150.00 |
| 2026-10-23 | Mylar prints for recording | 4 | $18.50 | $74.00 |
| 2026-10-24 | Recording fee, passed through at cost | 1 | $86.00 | $86.00 |
| 2026-10-27 | As-built survey, foundation (3 h) | 6 | $95.00 | $570.00 |
| 2026-10-27 | Foundation elevation shots | 12 | $6.00 | $72.00 |
| 2026-10-28 | Drafting: as-built exhibit | 3 | $82.00 | $246.00 |
| 2026-10-28 | Digital deliverables (DWG and PDF set) | 1 | $75.00 | $75.00 |
| 2026-10-29 | Project management | 4 | $110.00 | $440.00 |
| 2026-10-30 | Courier, plat delivery to county | 1 | $42.00 | $42.00 |
| 2026-10-30 | Monument reset after excavation, Lot 15 | 2 | $95.00 | $190.00 |
| Subtotal | $11,341.40 |
| Sales tax | $0.00 |
| Total due | $11,341.40 |